Gigabay Progress Report: June 2026 – The Wall Reaches Almost to the Top

Posted on October 27, 2026October 25, 2026 by The Star Queen

Hello, stargazers! 🚀 Welcome to my Gigabay Progress Report for June. This month I got one drive-by session at the SpaceX Gigabay at Kennedy Space Center, on June 25, with three photos taken within about three minutes. My last report covered May 8 and 20, so these photos come 36 days after my last May photos (May 20). What impressed me most? The black wall now reaches nearly to the top. On the north side only a thin band of open steel is left above it, by eye. And I finally got a look at the south side again, with two huge, tall openings framed in steel. 🖤🏗️

Header photo: June 25 – the north side from the road, the second photo of the morning (8:09 AM). This is the photo at the top of the post. Look for: the black wall, now a huge flat block that reaches nearly to the top, with only a thin band of open white steel above it; one of the two garage-door-style openings at the base, framed in steel, with white steel inside (the second opening is at the right, partly hidden by a red crane); a tall orange crane at the left and two red ones at the right; a line of green shrubs along the base; tan and white trailers and parked vehicles at the right; and a big gray pipe by the roadside ditch. I don’t see door panels in the openings.

A reminder: I take these as I drive by, so my angles change from photo to photo. I’m always grateful for the chances I get. I’ll show you what I can actually see, say “appears” when I’m not sure, and add the proper construction words so we can all learn together. 🌟

How I take these

The road I drive runs north and south, and the Gigabay sits on its west side. That means it’s on my left when I drive north and on my right when I drive south, and I’m always looking west at it. Some shots go through the windshield and some out the side window, so my sets never line up perfectly. I’ll use “left end” and “right end” of the building as I see it in each photo. This month: all three photos are from the morning of June 25, at about 8:08, 8:09 and 8:10 AM by my phone’s clock, under a sky with thin clouds and some blue. One photo shows the north side, the side with the two garage-door-style openings (the header photo), and two show the south side, where the huge bay doors will be and where the ship will enter. My close-up of the south side was taken from a parking lot beside it, through my windshield, so some reflections from inside my car show in the glass.

Where we left off in May

In my May report the big news was that the black wall had grown to about two-thirds of the visible height on the north side. (My April, March, February and January reports show how it got there.) My last north-side photos were from May 20, so that’s the day I’m comparing against:

  • Wall. On the north side, a black wall that looked like about two-thirds of the visible height, by eye, with a level top edge.
  • Openings. Two garage-door-style openings at the base, with white steel visible inside and no door panels that I could see.
  • Steel above. A shorter band of open white steel above the wall, with diagonal braces and gray metal deck, and a flat top.
  • Cranes. Several cranes, with yellow ones on top of the frame and a tall red one at the left. (I describe cranes only by color.)
  • South end. I didn’t get it in May. My last look was Apr 27: tall black panels with wide gaps of open steel between them, and a sandy yard (Apr 11).
Gigabay KSC – side-by-side of the north side, May 20, 2026 and June 25, 2026; on May 20 a flat black wall with two openings at the base covers about two-thirds of the face under a tall frame of open white steel, and on June 25 the black wall reaches nearly to the top with a thin band of open white steel above it and red and orange cranes at the sides; yellow boxes mark the black wall and blue boxes mark the open steel frame above it
The north side, 36 days apart. May 20 (left) vs. June 25 (right). The June photo was taken from farther back and from a different angle, so please don’t measure heights too closely. In the yellow boxes: the black wall looked like about two-thirds of the building’s height on May 20, and on June 25 it reaches nearly to the top, by eye. In the blue boxes: the open steel above the wall is now a thin band along the top. Look for: the two openings at the base on both days, the lighter gray side wall at the left end, and the yellow-topped cranes that stuck up above the frame on May 20. I don’t see them above the frame on June 25, but my angle is different, so I can’t say where they went.

For an outside check: NASASpaceflight (NSF) reported on Apr 23 that the main steel truss had reached its maximum height and that the siding was going up with progress every day. That fits what I see: the frame is done climbing, and the wall has been catching up with it. SpaceX says the finished building will stand 380 feet tall.

June 25 snapshot

Three photos from the morning of June 25 (8:08, 8:09 and 8:10 AM by my phone’s clock). The header photo above is the second one, the north side. The other two are the south side: first an angled look from the road, then a close-up from a parking lot.

Gigabay KSC – June 25, 2026 – south side – angled view through the car window of a huge dark wall with a tall steel-framed opening, open white steel above the wall, a palm tree and oak trees with hanging moss, a small dark gazebo, a white van, green boxes, orange cones and a light pole at the right
June 25 – the south side, from the road at an angle (8:08 AM). This is the south side, where the large bay doors will be. Look for: a tall opening framed in steel at the right, with stacked white steel inside and no door panel that I can see; a second, narrower opening at the left; the long diagonal shadow across the wall; the thin band of open white steel at the very top; a palm tree and oak trees with hanging moss in front; a small dark gazebo, a white van, green boxes and orange cones with red tape on the grass; and a yellow-orange machine near the base at the right. The part of the wall I can see from this angle looks plain dark gray. I cropped out my car’s mirror, and the dark curve at the top right is my car window.
Gigabay KSC – June 25, 2026 – south side – close low-angle view from a parking lot of the south face, a big plain dark wall with two very tall openings framed in steel, a thin band of open white steel with railings along the top, a tall light pole, black planters with small shrubs along the base and two angular silver trucks parked at the left and right; a black privacy block at the left covers a reflection of me in the windshield and the license plate of the truck at the left; the photo was taken through my windshield, so some reflections from inside my car show in the glass
June 25 – the south side, close-up from the parking lot (8:10 AM). This is the south side, where the ship will enter. I took this one through my windshield, so some reflections from inside my car show in the glass. Look for: a big, plain dark wall; two very tall openings framed in steel, with white steel framing visible inside and no door panels that I can see; a thin band of open white steel along the top, with what look like railings; a tall light pole; a row of black planters with small shrubs along the base; a strip of gravel; the painted lines of the parking lot; a white cylinder by the left opening; and a silver truck parked at each side. The black block at the left and the black patch on the front of the truck at the left are privacy edits. The black block covers a reflection of me in the windshield.

What changed since May

  • The wall nearly reaches the top. This is the biggest change on the north side. On May 20 the black wall looked like about two-thirds of the visible height, by eye. On June 25 it reaches nearly to the top (header photo and the comparison above). It goes on in horizontal rows called courses, from the bottom up, and I can’t say how many rows were added, because my angles don’t match exactly.
  • Only a thin band of open steel is left. Above the wall I see a thin band of white steel, a flat roof-level frame with diagonal braces, and in the south close-up what look like gray panels between the braces, which might be roof deck. I can’t see the top surface from the ground, so I can’t tell you how much roof is on. A line of thin horizontal rails runs along the top edge in the south close-up, which I think is edge protection for the crews.
  • The south side has two tall openings. In April the south end had tall black panels with wide gaps of open steel between them (Apr 11 and Apr 27). On June 25 the south wall looks continuous around two very tall openings framed in steel: a steel column up each side (the jambs) and a beam across the top (the header). I think these are the huge bay-door openings where the ship will enter, but that’s my guess from how they look. I see stacked white steel framing inside, and no door panels in either opening.
  • A big plain dark wall on the south side. In the close-up the south face is a huge, plain dark wall around the two tall openings. I can’t tell what it’s made of or how it’s attached. In the angled photo, the part of the wall I can see looks plain dark gray too.
  • The two north openings. The two garage-door-style openings at the base on the north side look much as they did in May, framed in steel with white steel inside (header photo). I don’t see door panels in them, and I can’t see inside, so I can’t say whether doors are in.
  • Site work. The ground around the south end looks very different from the sandy yard I saw on Apr 11. Now there’s a parking lot with painted lines, black planters with small shrubs along the wall, gravel, a tall light pole, a lawn with trees, a small gazebo and green boxes (south photos). On the north side I see a line of green shrubs along the base, which I don’t remember from May. I can’t tell whether it’s planting or plants that grew in. There’s also a big gray pipe by the roadside ditch with water in it, and tan and white trailers and many parked vehicles at the right. Some of this may have been there in May, so I can’t say what’s new.
  • Cranes. I describe cranes only by color. In the north photo I count a handful: a tall orange one at the left, a small yellow one far at the left, and two red ones at the right. I can’t tell you what kinds they are or what they’re doing. On May 20 I saw yellow ones on top of the frame and a tall red one at the left. I don’t see any above the frame in my June photo, but my angle is different, so I can’t say where they went.

Terms to know ✨

  • Roof deck: corrugated steel sheets laid across the top framing of a building, a bit like the floor of the roof. Insulation and a waterproof layer go on top. I can’t see the top from the ground, so I’m not sure how much is on.
  • Jamb: one of the two upright sides of an opening. The beam across the top is the header. In the south photos the jambs look like tall steel columns on each side of each opening.
  • Sitework: everything built on the ground around a building instead of the building itself: paving, parking, drainage, planting and light poles. The south photos show a lot of it.
  • Edge protection: railings or barriers along the edge of a roof or platform so nobody falls. I think the thin rails along the top of the steel in my close-up are edge protection, but I’m not certain.
  • Culvert: a pipe that carries water under a road or along a ditch. I think the big gray pipe by the roadside ditch in the north photo might be one, but I’m not sure.

What impressed me most

Two things. The north wall, which in 36 days went from about two-thirds black to nearly all the way to the top, with the steel poking out just a little above it. And the south side, with those two tall steel-framed openings in a big plain dark wall. It’s such a different look from the tall panels and wide gaps I showed in April. It’s a big change in a short time. 🚀

What I’m watching next

  • The top of the building. I can’t see the roof from the road, but I’ll watch the thin band of steel along the top edge for anything new. Closing in the walls and the roof is what builders call the building envelope. SpaceX says the finished Gigabay will stand 380 feet tall.
  • The last bit of wall. I’ll look at how the wall meets the steel at the top, and at the lighter gray wall at the left end of the north side.
  • The garage-door-style openings on the north side. I’ll keep looking for any change at them, such as door panels or door frames.
  • The south side’s large bay doors. These are where the ship will enter. I’ll keep checking the two tall openings for door panels or other changes.
  • The ground around it. More parking, planters, light poles and landscaping would tell me the sitework is moving along.
  • The cranes outside. I’ll keep noting how many I can see, and what color they are.

I’ll keep snapping photos every few weeks as I drive by. Look out for the next report!

Sources

  • SpaceX, “Future of Building Starship” (Mar 3, 2025): 380 ft building, 24 work cells. spacex.com/updates
  • NASASpaceflight, Apr 23, 2026 (primary steel truss at maximum height, siding progress every day): article

All photos by The Star Queen, taken at Kennedy Space Center. Some areas of the photos are blacked out for privacy. Photos are not official and are not affiliated with SpaceX or NASA.

Thank you for stargazing with me. Until next time, keep looking up (and sideways, at the cranes). ✨

Join the Star Queen's Launch List 🚀

Weekly space news, launch updates, and Gigabay photos, straight to your inbox.

Check your inbox or spam folder to confirm your subscription.

Post navigation

← Beyond SpaceX: The Rockets Racing Around the World 🌍🚀
New Glenn’s Pad Explosion: What Broke, What’s Rebuilt and When It Flies Again 🔥 →

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *


Math Captcha
+ 38 = 46


Recent Posts

  • Two Rockets, One Moon Landing: China Shares the Clearest Look Yet at Its Crewed Lunar Plan 🌕🚀
  • From a 3D-Printed Terran 1 to Terran R: How Relativity Space Reinvented Itself 🛠️
  • Terran R Explained: Relativity Space’s Big Reusable Rocket, October 2026 Edition 🚀
  • How a Rocket Actually Works: Newton, Fire and a Very Big Push 🚀
  • Apeiron Comes Home: Virgin Galactic’s New Spaceship Rides Eve to Spaceport America 🚀✨

Categories

Archives

Tags

Blue Origin Boca Chica constellation cosmic cosmic dust Falcon 9 Flight 15 Gigabay gravity grid fins Hangar X heartbreak Kennedy Space Center landing legs Mars Medium-Lift Rockets moon moons NASA New Glenn Nova Rocket orbit payload propellant Raptor 3 Relativity Space Return to flight Reusable Rockets rocket rockets rocket science sky solar flare SpaceX star Starbase stars Starship Starship Test Flight Static Fire steel-erection Stoke Space supernova Terran R universe

Starbase Live

Space Coast Live

Launch Pad Live

© 2026 Star Queen Chronicles | Powered by Minimalist Blog WordPress Theme

Powered by CookieAdmin
Necessary cookies enable essential site features like secure log-ins and consent preference adjustments. They do not store personal data.
None
Functional cookies support features like content sharing on social media, collecting feedback, and enabling third-party tools.
None
Analytical cookies track visitor interactions, providing insights on metrics like visitor count, bounce rate, and traffic sources.
None
Advertisement cookies deliver personalized ads based on your previous visits and analyze the effectiveness of ad campaigns.
None
Unclassified cookies are cookies that we are in the process of classifying, together with the providers of individual cookies.
None
Powered by CookieAdmin